Africa’s data centre market is approaching an inflection point.

Demand for digital infrastructure is being driven by cloud computing, digitalisation, data sovereignty and, increasingly, artificial intelligence. Yet as demand for computing capacity accelerates, the question facing developers and investors is becoming less about whether Africa needs more data centres and more about whether the continent can provide the power required to operate them reliably and at scale.

That distinction is important.

A data centre is not simply another commercial building. It is a highly energy-intensive infrastructure asset in which the availability, reliability and cost of electricity can determine whether a project is commercially viable.

The International Energy Agency estimates that data centres consumed approximately 415 TWh of electricity globally in 2024. On its base-case projection, that could more than double to approximately 945 TWh by 2030, with AI an important driver of the increase.

For Africa, this presents both a constraint and an opportunity.

Power is becoming a site-selection issue

The electricity requirements of a data centre extend well beyond its servers. Cooling, power conversion, UPS systems, lighting and other critical infrastructure all contribute to the load.

More importantly, the requirement is for continuous and highly reliable power. A data centre cannot ordinarily operate on the assumption that intermittent grid supply can simply be supplemented when necessary. Redundancy, backup systems and resilient grid connections are fundamental to the business model.

This makes power infrastructure part of the investment proposition from the outset.

McKinsey estimates that African data centre demand could increase from approximately 0.4 GW to between 1.5 GW and 2.2 GW by 2030, requiring substantial investment in both data centre capacity and supporting infrastructure.

The implication is significant: the availability of land and fibre is no longer sufficient to make a location attractive to a data centre developer. Power must be considered alongside both.

Africa’s energy position is more nuanced than the headline suggests

It would be misleading to ask whether Africa is “ready” for data centres as though the continent were a single energy market.

Readiness will vary considerably between jurisdictions and, in some cases, between individual locations within the same jurisdiction.

The relevant questions include whether a site has sufficient generation capacity; whether the transmission and distribution network can accommodate the proposed load; whether a connection can be delivered within the project’s timetable; what redundancy is available; and whether additional capacity can be secured as the facility expands.

The quality of the grid connection may therefore matter as much as the generation mix.

This distinction is particularly relevant where renewable energy is being presented as a competitive advantage. A high renewable share does not, by itself, guarantee 24/7 power availability.

Kenya illustrates the opportunity

Kenya has several characteristics that make it an attractive market for digital infrastructure.

Renewable sources accounted for approximately 80% of Kenya’s electricity mix in the year ended June 2025, with geothermal providing the largest share of generation, followed by hydro and wind.

That provides a potentially significant advantage as data centre operators and their customers increasingly consider the carbon intensity of electricity supply.

But the investment question is more demanding than simply asking how much of a country’s electricity is renewable.

For a hyper scale or AI facility, developers will need to consider firm capacity, grid stability, transmission constraints, connection timelines, tariffs, redundancy and the availability of additional power as the facility scales.

The opportunity for Kenya, and other African markets, is therefore not merely to offer renewable electricity. It is to offer reliable, scalable and commercially competitive renewable-backed power.

The emerging model may be different from the traditional one

Africa also has an opportunity to approach data centre development differently from mature markets.

Rather than locating digital infrastructure first and addressing power constraints afterwards, governments and developers can consider power and digital infrastructure together.

That could include combinations of grid supply, renewable power purchase agreements, wheeling arrangements, co-located generation, battery storage and other forms of behind-the-meter or dedicated power infrastructure, subject to the applicable regulatory framework.

This approach has implications well beyond the energy sector.

A data centre project may require coordinated decisions concerning land, planning, electricity connection, transmission infrastructure, water, environmental approvals, telecommunications, tax, financing and long-term power procurement.

The legal architecture needs to keep pace with that reality.

What this means for investors and developers

Power diligence should increasingly take place before a data centre site is selected, rather than after the real estate decision has effectively been made.

Investors and developers should be asking:

These questions are not peripheral to the project. They can determine its cost, timetable, resilience and investability.

The opportunity is to build digital infrastructure around Africa’s energy advantages

Africa’s relatively low data centre penetration should not be viewed only as an infrastructure deficit.

It creates an opportunity to develop digital infrastructure alongside new generation, transmission and storage capacity and, in markets with strong renewable resources, to build data centre capacity around those energy advantages.

The critical issue will be coordination.

If data centre development outpaces power planning, developers may face connection delays, constrained capacity, higher operating costs and greater reliance on backup generation.

If energy and digital infrastructure are planned together, data centres could instead become anchor customers for new power infrastructure, supporting investment in generation and grid capacity while accelerating the continent’s digital economy.

The question, therefore, is not simply whether Africa has enough electricity to host more data centres.

The more important question is whether Africa can develop the reliable, scalable and commercially viable power infrastructure that data centres, and increasingly AI infrastructure, will require.

That is likely to be one of the defining infrastructure questions of Africa’s digital economy over the next decade.

Manoah & Company Advocates advises investors, developers, technology businesses and infrastructure operators on energy, real estate, infrastructure development, regulatory compliance, commercial contracting and ESG. We support clients in structuring and executing the legal and commercial arrangements that underpin complex infrastructure projects, including the land, power, regulatory and contractual considerations relevant to data centre development.